Home > About Us > Building Project >
.
Drawings
.

Site Diagram

  • Drop-off/pick-up lane with overhead canopy to main entrances
  • 77 additional on-site parking spaces provided
  • Additional handicap parking stalls at all entrances

    Main Level

    New building - Main Level

  • Kitchen located on main level with convenient outside access
  • Fellowship Hall subdivides into three or more classrooms
  • Existing restrooms double in capacity, with "family" handicap accessible restroom added
  • Elevator provides access to all levels of addition and existing annex
  • Annex level-2 remodeled into chapel for intimate events (weddings, funerals, etc.)

    Lower Level

  • Large youth and young adult rooms with windows
  • New south entrance is handicap accessible to all levels of facility
  • Optional basement would allow for futre program development